FireGuard

Frazier Park

Senior Member

Joined: 02/20/2004

View Profile

Offline
|
Glad I was able to find a new Ram 3500 DRW on a local dealer lot, built just how I would have ordered it.
13Jeep Wrangler
07 Ragen 21FB
12 Yamaha Super Tenere
14 Suzuki DR 650
|
blt2ski

Kirkland, Wa

Moderator

Joined: 03/15/2001

View Profile

Offline
|
Make sure said flooded rigs don't make it to your non flood area for sale. I know of a few that have shown up here in NW US. Give dealer enough proff they sold you a flood rig, owners got money back and great price on a new rig....
May not always happen.
Marty
92 Navistar dump truck, 7.3L 7 sp, 4.33 gears with a Detroit no spin
2014 Chevy 1500 Dual cab 4x4
92 Red-e-haul 12K equipment trailer
|
mdcamping

CT

Senior Member

Joined: 03/04/2007

View Profile


Good Sam RV Club Member
Offline
|
over a week ago I put in a order for a new F150 3.5L HD Ecoboost 4X4 Supercrew, was told should be in by Dec. That said I remember ordering my Tacoma in 07, that took several months also. First camping trip is 4-2022 so that would be my maximum deadline, guess we shall see..
Mike
2022 F-150 3.5 EcoBoost 4X4 Supercrew GCWR 19,500 157WB
Payload 2476 Maxtow 13,800 3.73 Equalizer 4 Pt Sway Hitch
2017 Jayco Jay Flight 24RBS
Old TV, 07 Toyota Tacoma, Double Cab, Factory Tow Pkg, retired towing at 229K. (Son now owns truck)
|
Ark235B

Jonesboro, AR

Full Member

Joined: 08/16/2009

View Profile

Offline
|
GM truck orders are taking 34 weeks. I have that from a good source.
Justin Holder
2004.5 Dodge Ram 2500 Quad Cab SWB "600" Cummins
2010 Coachmen Chaparral Lite 270RKS Fifth Wheel
PPSEL
|
ford truck guy

Pennsylvania

Senior Member

Joined: 03/22/2008

View Profile


Good Sam RV Club Member
Offline
|
cummins2014 wrote: ford truck guy wrote: we have 3 @ F350's on order right now... my bro in law.... son in law.... and best buddy.... All 3 were ordered in March and was told probably Late August originally...
1 was in Production last week, the other 2 are scheduled for next week... 1 on 9/13 and the other on 9/15..
MSRP on highest was $79,285.00... signed for it at $ 71,000.00
Building 22's ,and they got 21's sitting unfinished , now that makes sense .My son has had a 22 on order for months ,and no build date at all .
IF its a Ford, tell him to drop the Adaptive Steering and it will get scheduled.... Right now, only the King Ranch with adaptive Steering are getting scheduled.... Some components in the steering wheels is holding it all up..
Me-Her-the kids
2020 Ford F350 SD 6.7
2020 Redwood 3991RD Garnet
|
|
philh

Belleville MI

Senior Member

Joined: 05/11/2015

View Profile

Offline
|
I ordered my '22 F350 on March 15, the day the order bank opened. date was supposed to be early June, and that slipped to mid July. @!#$$%^ Dealer in their infinite wisdom changed my order type from "retail" to "stock" on May 24. I caught the mistake and raised all kinds of HE!!, to get it changed back, which they did, but my order date is officially 6/5. I and my wife raised enough stink through a couple of different avenues, we now how the highest priority Ford can assign. I had a date of 9/8, which then became 9/7, and now is 9/17.
.
I'm sitting on pins an needles, because my new 5th wheel is sitting at the dealer waiting for me to pick it up. If it slips anymore, I'm going to have to pay someone to move 700 miles
|
Bowti

Wisconsin

Senior Member

Joined: 03/13/2013

View Profile

Offline
|
OK, 3 pages now and no one that ordered a new 2022 HD truck has received it. Not even those who ordered one last March, that's 6 months ago. Hard to believe this country is in this kind of shape.
|
monkey44

Cape Cod, MA and Central Fla

Senior Member

Joined: 11/12/2002

View Profile

Offline
|
Not so hard to believe when we depend on out-sourcing products we need ... how many of us would pay more, keep business in-house, and get our truck and products when we want or need them. Count me in !!
Monkey44
Cape Cod Ma & Central Fla
Chevy 2500HD 4x4 DC-SB
2008 Lance 845
Back-country camping fanatic
|
FishOnOne

The Great State of Texas

Senior Member

Joined: 02/12/2011

View Profile

Offline
|
monkey44 wrote: Not so hard to believe when we depend on out-sourcing products we need ... how many of us would pay more, keep business in-house, and get our truck and products when we want or need them. Count me in !!
Count me in as well...
'12 Ford Super Duty FX4 ELD CC 6.7 PSD 400HP 800ft/lbs "270k Miles"
'16 Sprinter 319MKS "Wide Body"
|
4x4ord

Alberta

Senior Member

Joined: 12/23/2010

View Profile

|
philh wrote: 4x4ord wrote: When I ordered my 2022 they said it would be in by the end of August. Now that we are into September I called to see where my truck is and they don’t have a build date for me yet ….. so it turns out I’m going to have to do a oil change on my 2021.
Make sure the dealer added your email to the order. Also, did you order with Adaptive Steering? That option is on indefinite delay. I cancelled it off of my order and finally got scheduled.
No I didn't order Adaptive Steering. I don't remember exactly but I think the truck was ordered about May .... My '21 was 2 months from order to built.
2022 F350 SRW Platinum short box 4x4.
B&W Companion
2008 Citation Platinum XL 34.5
|
|